Details of the proposed project are shown below. There are two choices. The first is a typical gravity system. This requires laying pipe straight and some times deep. The alternative is a pumping system where each property has pumping system as shown schematically below.
On this page:
- Map of properties involved
- Typical lot for gravity system arrangement
- Typical lot for forced pumping arrangement
- Typical forced pumping system schematic
Links to reports:
- Town Sanitarian Letter May 26, 2020 – Request to Explore Sewer Option
- Dean Pocono Wastewater Management Plan – June 2020
- Public Information Meeting Presentation – Project Update (November 21, 2024)
- View 2018 Survey Form and results.
- Survey Results January 2019
Map of properties involved
Typical lot for gravity system arrangement
Typical lot for forced pumping arrangement
Typical forced pumping system schematic