Total Future Flow

An official accounting of current flow plus flow projected from approved applications, updated periodically as new applications are approved. The current flow will be a 3-month average of actual flow.  After approved applications are completed and occupied, the properties will be removed from the list of projected flows.

When the Total Future Flow reaches 90% of allowable flow capacity, the sewer flow limits, aka moratorium, will be reinstated with the current Section 1.2 of the BWPCA Rules and Regulations.

Total Allowed Capacity 580,000
90% Total Allowed Capacity 522,000
3-month average (October-December 2024) 313,554
Anticipated Flow 133,623
Total Future Flow 447,177
Available Capacity 74,823