Total Future Flow
An official accounting of current flow plus flow projected from approved applications, updated periodically as new applications are approved. The current flow will be a 3-month average of actual flow. After approved applications are completed and occupied, the properties will be removed from the list of projected flows.
When the Total Future Flow reaches 90% of allowable flow capacity, the sewer flow limits, aka moratorium, will be reinstated with the current Section 1.2 of the BWPCA Rules and Regulations.
| Total Allowed Capacity | 580,000 |
| 90% Total Allowed Capacity | 522,000 |
| 3-month average (Apr 2026-Jun 2026) | 354,000 |
| Anticipated Flow | 117,000 |
| Total Future Flow | 471,000 |
| Available Capacity | 51,000 |