1. The Route 133 Pump Station second phase upgrade is undergoing engineering design to
2. Install a by-pass system to the main station at the intersection of Federal and Candlwood Lake roads.
3. The Brookfield Market Area design was completed and project put out to bid. The WPCA has received notice that a STEAP Grant was awarded. This should be finalized in 2023.
4. System designs are underway for sewer installations in the area of the Candlewood Peninsula and the Dean Pocono Road area.
5. A cyber security plan was implanted as a requirement for a cyber insurance policy purchased in 2023.