Upgrades 2023

1. The Route 133 Pump Station second phase upgrade is undergoing engineering design to

  • For an upgraded pump system in the new larger wet-well
  • The first phase is completed to install a larger wet well and modern generator.

2. Install a by-pass system to the main station at the intersection of Federal and Candlwood Lake roads.

3. The Brookfield Market Area design was completed and project put out to bid. The WPCA has received notice that a STEAP Grant was awarded. This should be finalized in 2023.

4. System designs are underway for sewer installations in the area of the Candlewood Peninsula and the Dean Pocono Road area.

5. A cyber security plan was implanted as a requirement for a cyber insurance policy purchased in 2023.