Dean & Pocono Road Project Detail

Details of the proposed project are shown below. There are two choices. The first is a typical gravity system. This requires laying pipe straight and some times deep. The alternative is a pumping system where each property has pumping system as shown schematically below.

Map of properties involved

Typical lot for gravity system arrangement

Typical lot for forced pumping arrangement

Typical forced pumping system schematic